Dragon Studios
Large-Scale Mezzanine Installation | Bridgend
The Brief
Albion was appointed to install a large mezzanine floor throughout the warehouse at Dragon Studios in Bridgend, creating additional usable space within the new production facility.
- Project Value
- Completed
- Duration
- Albion Team

Our Solution
Albion installed a mezzanine floor covering the whole warehouse, providing a substantial additional level within the building.
The project was carefully planned and delivered over an eight-week programme.
The Challenge
This was the largest mezzanine Albion had installed at the time, making it a significant project for the business and our installation team.
The scale of the installation required careful planning and coordination throughout the eight-week programme.